So, my lady-wife and I don't do "anniversaries" - we do "annual honeymoons." We (try to) take a week and go be sweet-hearts. With the schedule at the day-job, getting a week off this summer was "not highly likely" which meant that a day or two here and there was the best one could hope for. However, I was able to schedule a full week off for our "honeymoon." We had planned to return to Beaver Island, in Lake Michigan, where we had gone after our wedding. Then, interesting things happened.
A colleague (well, highly regarded tester and speaker on testing and test consultant) asked if I'd be interested if she put my name forward as a possible candidate to fill her spot on the schedule at TesTrek, run by QAI. I was a little surprised, well, a lot surprised, and said I'd be happy, and honored, to be considered. The only drawback was the timing - the week slated to go to Beaver Island. That could be a problem. The week we try and reserve just for us would turn into a little bit of "us time" and a lot of "conference/work" time. Positive side, it was in Toronto.
With a little concern, I approached my Lady Wife and asked what she thought. Her response was "I LOVE Toronto!" So, away we went. As things happened, I found myself in a position to prepare an abstract and submit it to the folks at QAI. It was approved, which meant getting a presentation together that consisted of more than vague ideas.
The topic was one that I suspected may be a big draw - Test Process Improvement. That is one of the "Almost 124.7% certain to be on a Conference Agenda" topics, along with Estimation, Automation and Requirements. Now, this was not the intimidating part. The intimidating part was that there were a stack of people who were going to be there who would very probably disagree with me. I don't have a problem with that. In fact, I've gotten quite good at having people disagree with me. I can even be gracious when people can explain why clearly, and with a reasoneid argument. I've been known to get along quite well with people with whom I have a professional disagreement. Mind you, some folks have a harder time with that.
The thing was, I've done lunch and learns and training sessions and presentations for teams I've been on and led and worked with. I've been doing drumming workshops for many years, in addition to the group and private lessons I've done. The thing was, these weren't novices or non-testers I'd be speaking to - they were testers and test managers and consultants and maybe famous testing people. Gulp. Some of them were bound to know the topic better than I did. Then I remembered the Abstract I worked on and the presentation I had worked so hard on. This was sharing what I had learned - not what some expert said was the "right" way to do things. And that was my starting point.
I do not have answers nor do I have a magic wand to reveal the secrets that need to be revealed. But I can talk about what I learned myself. And if some of the people who wrote the things I read and tried some of their ideas were sitting in the room - fine! My hat's off to them and I'll credit them with being the source for ideas.
Now, I had done "practice runs" with the slides and watching myself in mirrors and such - and done a dry run with volunteer co-workers. I had three possible paths planned for the exercise portion, depending on the number of people, the room layout and, frankly, how the lead up to it went. Five minutes before I was to start, I had the projector ready, a bottle of water handy, the way-cool remote clickey thing to advance the slides was hooked up - and the wireless mic was clipped to my belt. No worries.
The "Track Host" walked up to introduce me and... the next 30 seconds were a warning. The "click on" for the wireless mic didn't. The cool remote thingie... didn't. I muttered something about testing software and not hardware and dove in. The next 90 minutes flew by. I asked questions, people answered, people asked questions, I responded - then attendees responded - then all of a sudden things were cruising.
Moral of the story - If you have never tried to present on a topic, ANY topic - try it. It does not need to be at a conference where "major names" are speaking. It could be a local testing group meeting, a company lunch and learn, something. Maybe a "lightning talk" at local meeting or regional conference? It does not need to be a 60 or 90 minute presentation. But make it something, somewhere.
The fact is, you know something that may help someone else. Someone else may likely have the same kind of questions you did. If you ever wondered what you could do to improve yourself - this may be it. Do something that may help someone else and learn about yourself. It may also help you meet some really way cool people.
Oh, we had a great honeymoon, too. Toronto's a great city to visit.
Saturday, October 23, 2010
Tuesday, October 12, 2010
Improving Test Processes, Part IV, or The TPI Secret of Secrets
So far, I rambled about Improving Processes. In Part I, I wrote about how we may recognize there's a problem, but may not be sure what the problem is. In Part II, I wrote about the problem of introspection and how hard it can be to see outside ourselves and look at how we really are. In Part III, I wrote about Don Quixote and the unattainable goal of Process when the Charter and Mission are in disarray.
The simple fact is, each of these things play a part in that which makes up Test Process Improvement.
Now for the secret. TPI is not the point. TPI is not the goal.
In the end, TPI doesn't really matter except as a means to the REAL goal.
The REAL goal is this: Better Value from your Testing Effort.
The thing is, most humans don't think in a clear fashion. I know I don't think in a way that can be described as linear in any way, shape or form. That is particularly true when I'm working on a problem. If I DID I would long ago have stopped looking into something I was testing because it did not feel right, even though there was nothing on the surface to indicate there was a problem. When I have one of those feelings, I sometimes will go over what I have for notes, look at the logs from the applications (not the nicely formatted versions, but the raw logs) or poke around in the database. Sometimes its nothing. Sometimes, I sit back and think "Well, look at that. Where did that come from?" (Actually, I sometimes say that out loud.)
That is the pay-off for me as a tester. I found something with a strong likelihood of causing grief for the users/customers which will in turn cause grief for my company.
I don't know how to describe that in a linear fashion. I wish I did, I'd probably be able to make a pile of money from it and live comfortably for the rest of my life from the earnings. The fact is, its too organic - organic in the sense that Jerry Weinberg used the term the first time I encountered it in this context (Becoming a Technical Leader) not in the Chemistry organic/carbon-based context.
The Test Script (and its companion, the formal Test Process Document) is not the Test. The Test is the part that is done by the M1-A1 Human Brain. Using that most powerful tool is the key to gaining value from testing - or improving the value you are currently getting.
You can have the best Process in the World of Software. You can have the best Charter and Mission statements. You can have the best tools money can buy.
Without encouraging your people to think when they are working, and rewarding them when they do it creatively and do it well, none of those other things matter.
The simple fact is, each of these things play a part in that which makes up Test Process Improvement.
Now for the secret. TPI is not the point. TPI is not the goal.
In the end, TPI doesn't really matter except as a means to the REAL goal.
The REAL goal is this: Better Value from your Testing Effort.
The thing is, most humans don't think in a clear fashion. I know I don't think in a way that can be described as linear in any way, shape or form. That is particularly true when I'm working on a problem. If I DID I would long ago have stopped looking into something I was testing because it did not feel right, even though there was nothing on the surface to indicate there was a problem. When I have one of those feelings, I sometimes will go over what I have for notes, look at the logs from the applications (not the nicely formatted versions, but the raw logs) or poke around in the database. Sometimes its nothing. Sometimes, I sit back and think "Well, look at that. Where did that come from?" (Actually, I sometimes say that out loud.)
That is the pay-off for me as a tester. I found something with a strong likelihood of causing grief for the users/customers which will in turn cause grief for my company.
I don't know how to describe that in a linear fashion. I wish I did, I'd probably be able to make a pile of money from it and live comfortably for the rest of my life from the earnings. The fact is, its too organic - organic in the sense that Jerry Weinberg used the term the first time I encountered it in this context (Becoming a Technical Leader) not in the Chemistry organic/carbon-based context.
The Test Script (and its companion, the formal Test Process Document) is not the Test. The Test is the part that is done by the M1-A1 Human Brain. Using that most powerful tool is the key to gaining value from testing - or improving the value you are currently getting.
You can have the best Process in the World of Software. You can have the best Charter and Mission statements. You can have the best tools money can buy.
Without encouraging your people to think when they are working, and rewarding them when they do it creatively and do it well, none of those other things matter.
Labels:
Best Practices,
Process Improvement,
Secrets,
testing
Monday, October 4, 2010
Improving Processes, Part III, or, Why Don Quixote's Quest May Have Ended Better Than Yours Will
A few weeks ago, while looking for some other information, I stumbled across the power point slides of a conference session on Test Process Improvement that I decided was "not a good fit" for me. Yeah, I walked out... about 10 minutes into it.
The premise was "If you don't have a Process, you need one. If you don't have a Process, you have Chaos and Chaos is bad." Following the obligatory introduction, and some seven minutes of what appeared to be gratuitous assertions, I said, "Enough" and walked out.
Having a Process is not a silver bullet. Simply having a Process will not magically fix your Chaotic environment. If you are trying to impose Process on the organization wearing your "Tester" white hat or the plate mail of the Quality Paladin, good luck. Most places where I've seen Chaos rule, its because someone with a lot of scrambled eggs on their hat likes it that way. (I wonder how many metaphors I can pull into one paragraph? Better quit there.)
However, if you have a Process and no one follows it, the question should be why not? My previous blog posts (Part II and Part I of this thread) talked about how the "problem" might not be the real problem and how you need to seriously look at what you are doing before you can fix what might need fixing.
When you look long and hard and honestly at what you and your group is doing, when you find the places where what is done varies from what The Process says, you must determine why this difference exists.
I suspect that it will boil down to a matter of relevance. The official Process has no relevance to the reality of what actually is needed in those situations. If it is a one-off, then there may be something that can be tweaked. If it is a regular occurrence, then the value of The Process comes into question. If it doesn't work, why pretend it does? Why bother having it at all?
Granted, The Process may have been relevant at one time and things may have changed since it was introduced. However, nothing is permanent. Change is inevitable. Even The Process may need to be updated from time to time.
When you do, look to the Purpose your team is to fulfill. Why do you exist? What is your Charter? What is your Mission? Do you have a Mission? I'll bet you do, even if you don't know what it is.
To start, look to what Management expects. If a boss-type is telling you that the Test Process needs improvement, try talking with them. Discuss with them what they believe needs to be improved or where the gaps are. This may become the basis of the group's Charter.
The Quest that you are expected to follow.
What are they seeing as "broken" that needs to be fixed?
If the gist is "there are too many defects being found by customers" ask if there are specific examples. Anecdotal evidence can paint a compelling story, yet without specific examples, you may never be able to find hard facts Is this a hunch or are there specific examples? Are these defects, as in they should have been found in testing?
Maybe these are aspects of the application that the customers expected to behave differently than they received? If they are, why is that? How can that be? How can the expectations be so different than what you believed it would be? After all! The Design and Requirements, that you based the tests on, matched perfectly!
Let us ask Dulcinea how these things can be so different than what they appear to be?
The premise was "If you don't have a Process, you need one. If you don't have a Process, you have Chaos and Chaos is bad." Following the obligatory introduction, and some seven minutes of what appeared to be gratuitous assertions, I said, "Enough" and walked out.
Having a Process is not a silver bullet. Simply having a Process will not magically fix your Chaotic environment. If you are trying to impose Process on the organization wearing your "Tester" white hat or the plate mail of the Quality Paladin, good luck. Most places where I've seen Chaos rule, its because someone with a lot of scrambled eggs on their hat likes it that way. (I wonder how many metaphors I can pull into one paragraph? Better quit there.)
However, if you have a Process and no one follows it, the question should be why not? My previous blog posts (Part II and Part I of this thread) talked about how the "problem" might not be the real problem and how you need to seriously look at what you are doing before you can fix what might need fixing.
When you look long and hard and honestly at what you and your group is doing, when you find the places where what is done varies from what The Process says, you must determine why this difference exists.
I suspect that it will boil down to a matter of relevance. The official Process has no relevance to the reality of what actually is needed in those situations. If it is a one-off, then there may be something that can be tweaked. If it is a regular occurrence, then the value of The Process comes into question. If it doesn't work, why pretend it does? Why bother having it at all?
Granted, The Process may have been relevant at one time and things may have changed since it was introduced. However, nothing is permanent. Change is inevitable. Even The Process may need to be updated from time to time.
When you do, look to the Purpose your team is to fulfill. Why do you exist? What is your Charter? What is your Mission? Do you have a Mission? I'll bet you do, even if you don't know what it is.
To start, look to what Management expects. If a boss-type is telling you that the Test Process needs improvement, try talking with them. Discuss with them what they believe needs to be improved or where the gaps are. This may become the basis of the group's Charter.
The Quest that you are expected to follow.
What are they seeing as "broken" that needs to be fixed?
If the gist is "there are too many defects being found by customers" ask if there are specific examples. Anecdotal evidence can paint a compelling story, yet without specific examples, you may never be able to find hard facts Is this a hunch or are there specific examples? Are these defects, as in they should have been found in testing?
Maybe these are aspects of the application that the customers expected to behave differently than they received? If they are, why is that? How can that be? How can the expectations be so different than what you believed it would be? After all! The Design and Requirements, that you based the tests on, matched perfectly!
Let us ask Dulcinea how these things can be so different than what they appear to be?
Labels:
Design,
Don Quixote,
Process Improvement,
Requirements
Saturday, October 2, 2010
Improving Processes, Part II
O would some power the giftie gie us
to see ourselves as others see us.
to see ourselves as others see us.
- Robert Burns, To a Louse
Right. So if you need that translated, Rabbie was saying this, in English:
O would some power the gift to give us
to see ourselves as others see us.
to see ourselves as others see us.
There are a couple of things that are just hard to do for most people. One, is to change our perspective and see what others see in us. The really hard part is similar to that: to look at ourselves honestly, and see what we really are like.
Any time that self examination comes into play, most folks will avoid it as much as possible. We can tell wee little fibs and stories and justify actions by many interesting machinations. Yet when we strip those aside, what are we left with?
That is the really hard part in any form of process improvement. When we look at ourselves, as individuals or as a group, the challenge is to set aside what we wish we were doing or like to think we do, and focus on our true actions.
If our real processes and the official process don't match, we need to ask ourselves, "Why not?"
Indeed, to see ourselves as we really are, or as others see us, can be an event that we don't want to face. Without doing that, we can never improve.
Friday, October 1, 2010
Improving Processes and Other Stuff, Part 1
I've been teaching a lot of pipe band drumming workshops lately. Well, "a lot" compared to the last two years anyway. They can be hard, but generally are great fun. By the time I realize how tired I am, I'm half way home - close enough where a cup of Tim Horton's coffee will get me home (yes, there are some in Michigan.)
So, this last session was a mix of absolute beginners and those that were a step or two beyond that. They all play in the same band, or aspire to anyway, and so have a common bond between them. Part of the intention of the workshop organizers is to not only teach the beginners, but teach the more advanced players how to teach.
That actually is easier than it sounds, at least with drumming. I get to present an idea, work on some exercises, see who is getting it and who isn't. If it is a physical thing, there are other exercises to try. If it is a mental thing or thought process thing, then I present the same basic idea another way - changing the context sometimes makes it easier.
This last session we were working on triplets. Cool things, those triplets. They are also bread-and-butter stuff for pipe band drumming. The kind of thing where if you don't get them, your future as a pipe band drummer is quite limited. One guy was having a bit of a hard time with them than the other students. Mind you, these students ranged in age from 8 years to the mid-30's or so. This particular fellow was doing alright, but was having an issue with getting his head around the idea of "three notes where normally there are two."
I handed out a bunch of candy/sweets to the other participants and asked this fellow to play the bit he was having a problem with. Perfect. So I asked him to do it again. Perfect. Third time was still perfect. Hmmm... it does not look like its the actual "hard bit" thats the issue. So I had him play the exercise from the beginning. Trainwreck! Had him slow things down and do it again - same thing. The second time I noticed something in what he was doing. As he got closer to the "hard part" his grip tensed up (he gripped his sticks harder) his muscles in his forearms tensed visibly - both bad things for drummers. Try as he might, the sticks simply were not going to do what he wanted them to do. When he jumped right into it, things worked fine.
If the first step to solving a problem is recognizing you have a problem, how do you know what the problem is? In this poor fellow's case, he knew he had a problem and simply could not see what it was. It wasn't the problem he thought he was having - it some something else entirely. When he stayed relaxed throughout the line of the exercise, he played it flawlessly. Problem solved. But what was the problem?
When it comes to process improvement for nearly anything, I try and apply the same approach: There may be a problem, lets see what the symptoms are and see if we can isolate the problem - instead of whacking the symptoms or results of the problem.
When looking at Test Process Improvement in particular, the problem that gets described is usually a symptom or list of symptoms - not the actual problem. We can stomp on symptoms one at a time, without really addressing the crux if the problem. That will continue to churn and bubble and fester until something else breaks.
The "problems" presented usually are presented in a handfull of ways:
When I was younger and not as diplomatic as I am today, my reaction to each of those points generally ran something like "Compared to what?" Now, in my more mellow state and place of being, I only think that. Sometimes loudly, but what comes out of the mouth runs something like, "Can you explain what you mean by 'too long' so I can understand better what you expect? An awful lot of the time our original estimates on test effort or duration are based on the understanding of what the project will entail at the time the estimates are made. As the project develops, we learn more and that will impact both the revised effort estimates and the actual duration. What we are doing is based on the instructions given to us and the mandates for what critical processes must be validated. Perhaps this needs to be reconsidered."
So, I guess that's a long-winded version of "Compared to what?" but it tends to go over a bit better.
What I do wonder, however, when a boss-type says something like those statements, is "Are those symptoms or problems?" Are we running over timelines and cost estimates because of other things than lousy estimates? Are "due dates" being missed because of testing? Are there a flurry of defects keeping customers from using the new release?
Is there something else going on and these are perceptions of problems, rarther than symptoms of problems?
So, this last session was a mix of absolute beginners and those that were a step or two beyond that. They all play in the same band, or aspire to anyway, and so have a common bond between them. Part of the intention of the workshop organizers is to not only teach the beginners, but teach the more advanced players how to teach.
That actually is easier than it sounds, at least with drumming. I get to present an idea, work on some exercises, see who is getting it and who isn't. If it is a physical thing, there are other exercises to try. If it is a mental thing or thought process thing, then I present the same basic idea another way - changing the context sometimes makes it easier.
This last session we were working on triplets. Cool things, those triplets. They are also bread-and-butter stuff for pipe band drumming. The kind of thing where if you don't get them, your future as a pipe band drummer is quite limited. One guy was having a bit of a hard time with them than the other students. Mind you, these students ranged in age from 8 years to the mid-30's or so. This particular fellow was doing alright, but was having an issue with getting his head around the idea of "three notes where normally there are two."
I handed out a bunch of candy/sweets to the other participants and asked this fellow to play the bit he was having a problem with. Perfect. So I asked him to do it again. Perfect. Third time was still perfect. Hmmm... it does not look like its the actual "hard bit" thats the issue. So I had him play the exercise from the beginning. Trainwreck! Had him slow things down and do it again - same thing. The second time I noticed something in what he was doing. As he got closer to the "hard part" his grip tensed up (he gripped his sticks harder) his muscles in his forearms tensed visibly - both bad things for drummers. Try as he might, the sticks simply were not going to do what he wanted them to do. When he jumped right into it, things worked fine.
If the first step to solving a problem is recognizing you have a problem, how do you know what the problem is? In this poor fellow's case, he knew he had a problem and simply could not see what it was. It wasn't the problem he thought he was having - it some something else entirely. When he stayed relaxed throughout the line of the exercise, he played it flawlessly. Problem solved. But what was the problem?
When it comes to process improvement for nearly anything, I try and apply the same approach: There may be a problem, lets see what the symptoms are and see if we can isolate the problem - instead of whacking the symptoms or results of the problem.
When looking at Test Process Improvement in particular, the problem that gets described is usually a symptom or list of symptoms - not the actual problem. We can stomp on symptoms one at a time, without really addressing the crux if the problem. That will continue to churn and bubble and fester until something else breaks.
The "problems" presented usually are presented in a handfull of ways:
- Testing is taking too long;
- Testing costs too much;
- Too many defects are being found by customers.
When I was younger and not as diplomatic as I am today, my reaction to each of those points generally ran something like "Compared to what?" Now, in my more mellow state and place of being, I only think that. Sometimes loudly, but what comes out of the mouth runs something like, "Can you explain what you mean by 'too long' so I can understand better what you expect? An awful lot of the time our original estimates on test effort or duration are based on the understanding of what the project will entail at the time the estimates are made. As the project develops, we learn more and that will impact both the revised effort estimates and the actual duration. What we are doing is based on the instructions given to us and the mandates for what critical processes must be validated. Perhaps this needs to be reconsidered."
So, I guess that's a long-winded version of "Compared to what?" but it tends to go over a bit better.
What I do wonder, however, when a boss-type says something like those statements, is "Are those symptoms or problems?" Are we running over timelines and cost estimates because of other things than lousy estimates? Are "due dates" being missed because of testing? Are there a flurry of defects keeping customers from using the new release?
Is there something else going on and these are perceptions of problems, rarther than symptoms of problems?
Labels:
Drumming,
Investigation,
Process Improvement,
testing
Wednesday, September 29, 2010
Requirements, Traceability and El Dorado
The day-job has been crazy busy the last several weeks. I have several half-written entries that I want to finish and post and with the project hours, and stuff needed to be done at home, there simply has not been much time. However, I've been lurking in a couple of places, reading posts and email conversations, getting my fix of "smart people's thoughts" that way.
The interesting thing is that a couple of themes have crept back up and I finally have the chance to take a look at the topic(s) myself and consider some aspects I may not have considered.
The initial question revolved around defining requirements and establishing traceability of test plans, test cases and the like back to requirements. By extension, when executing the test cases defects found should likewise be able to be traced back to said requirements.
Now, folks who have read my blog in the past will realize that I've been writing about requirements off an and for some time. Well, actually, its more "on" than "off." I write about requirements and testing a lot. Possibly this is because the struggles of the company I work with on defining requirements and the subsequent struggles to adequately test the software products created from those requirements. Now, to be clear, it is not simply this company I am with that has an issue. Most places I've worked have been seriously "requirements challenged."
One thing that sends up every warning flag the back of my neck has is the idea that we can fully define the requirements before doing anything else. I know, Robin Goldsmith has an interesting book on defining "REAL requirements" and he has some good ideas. In light of the shops where I have worked over the last, oh, 25 and more years, some of these ideas simply don't apply. They are not bad ideas, in fact, I think testers should read the book and get a better understanding of it. (Look here to find it, yeah, I know its pretty pricey - expense it.)
Having said that, how many times have we heard people (developers, testers, analysts of some flavor, project managers, et al.) complain that the "customers" either "don't know what they want" or "changed their requirements." I've written before about the understanding of requirements changing, and how considering one aspect of a project may inform understanding on another. When this happens in design, development, or worse testing, the automatic chorus is that the "users" don't know what they want and work will need to be changed. All of us have encountered this right? This is nothing new, presumably.
My point with this revisit is that if you are looking to find the cause of this recurring phenomenon, look in a mirror. All of us have our own biases that effect everything we do - whether we intend to or not.
So, if your shop is like some I've worked in, you get a really nice Requirements Document that formally spells out the requirements for the new system or enhancement to the existing system. The "designers" take this and work on their design. Test planners start working on planning how they will test the software and (maybe) what things they will look for when reviewing the design.
Someone, maybe a tester, maybe a developer, will notice something; maybe an inconsistency, maybe they'll just have a hunch that the pieces don't quite go together as neatly as they should. So a question will be asked. Several things may happen. In some cases, the developer will be given a vague instruction to "handle it." In some cases, there will be much back and forth over what the system "should" do, then the developer will be told to "handle it."
At one shop I worked at, the normal result was a boss type demanding why QA (me) had not found the problem earlier.
My point is, defining requirements itself is an ongoing process around which all the other functions in software development operate.
Michael Bolton recently blogged on test framing. It is an interesting read. It also falls nicely into a question raised by Rebecca Staton-Reinstein's book Conventional Wisdom around how frames and perspectives can be both limiting and liberating.
This brings me back to my unanswered question on Requirements: How do you show traceability and coverage in advance when it is 99.99% certain that you do not know all the requirements? Can it really be done or is it a fabled goal that can't be reached - like the city of gold?
Wiser people than me may know the answer.
The interesting thing is that a couple of themes have crept back up and I finally have the chance to take a look at the topic(s) myself and consider some aspects I may not have considered.
The initial question revolved around defining requirements and establishing traceability of test plans, test cases and the like back to requirements. By extension, when executing the test cases defects found should likewise be able to be traced back to said requirements.
Now, folks who have read my blog in the past will realize that I've been writing about requirements off an and for some time. Well, actually, its more "on" than "off." I write about requirements and testing a lot. Possibly this is because the struggles of the company I work with on defining requirements and the subsequent struggles to adequately test the software products created from those requirements. Now, to be clear, it is not simply this company I am with that has an issue. Most places I've worked have been seriously "requirements challenged."
One thing that sends up every warning flag the back of my neck has is the idea that we can fully define the requirements before doing anything else. I know, Robin Goldsmith has an interesting book on defining "REAL requirements" and he has some good ideas. In light of the shops where I have worked over the last, oh, 25 and more years, some of these ideas simply don't apply. They are not bad ideas, in fact, I think testers should read the book and get a better understanding of it. (Look here to find it, yeah, I know its pretty pricey - expense it.)
Having said that, how many times have we heard people (developers, testers, analysts of some flavor, project managers, et al.) complain that the "customers" either "don't know what they want" or "changed their requirements." I've written before about the understanding of requirements changing, and how considering one aspect of a project may inform understanding on another. When this happens in design, development, or worse testing, the automatic chorus is that the "users" don't know what they want and work will need to be changed. All of us have encountered this right? This is nothing new, presumably.
My point with this revisit is that if you are looking to find the cause of this recurring phenomenon, look in a mirror. All of us have our own biases that effect everything we do - whether we intend to or not.
So, if your shop is like some I've worked in, you get a really nice Requirements Document that formally spells out the requirements for the new system or enhancement to the existing system. The "designers" take this and work on their design. Test planners start working on planning how they will test the software and (maybe) what things they will look for when reviewing the design.
Someone, maybe a tester, maybe a developer, will notice something; maybe an inconsistency, maybe they'll just have a hunch that the pieces don't quite go together as neatly as they should. So a question will be asked. Several things may happen. In some cases, the developer will be given a vague instruction to "handle it." In some cases, there will be much back and forth over what the system "should" do, then the developer will be told to "handle it."
At one shop I worked at, the normal result was a boss type demanding why QA (me) had not found the problem earlier.
My point is, defining requirements itself is an ongoing process around which all the other functions in software development operate.
Michael Bolton recently blogged on test framing. It is an interesting read. It also falls nicely into a question raised by Rebecca Staton-Reinstein's book Conventional Wisdom around how frames and perspectives can be both limiting and liberating.
This brings me back to my unanswered question on Requirements: How do you show traceability and coverage in advance when it is 99.99% certain that you do not know all the requirements? Can it really be done or is it a fabled goal that can't be reached - like the city of gold?
Wiser people than me may know the answer.
Monday, August 30, 2010
Learning and Teaching and Leading
One thing I learned early on when teaching drumming students, particularly beginners, is that the person who learns the most is often the teacher.
It never seems to matter whether the lesson is an individual or group lesson, focused on one style or general drumming - the process of teaching beginners forces the instructor to reconsider things that the instructor simply does. This forces the teacher to reconsider all that he does, find interesting foibles or potential weaknesses, then correct or change them as needed for working with the student.
The interesting thing is that this reflection sometimes leads to profound understanding of what the student is learning and what the instructor is conveying. When preparing for the odd lunch-and-learn or training session at the office I never really had that kind of an experience - or when presenting such sessions.
On Improvement...
This last couple of weeks something interesting happened. I've been preparing a presentation on Test Process Improvement for TesTrek in October. I wasn't scheduled to present, or lead a workshop, but as a couple of presenters had to cancel, Viola! I'm on the presenters list. Then, a couple of other things came into my observation.
There have been several conversations on email lists I'm a participant in, as well as forums, on the dreaded M word. Yes - Metrics.
On top of this, I had a remarkably revealing email conversation with Markus Gartner - amazingly bright guy. This came about because the questions I submitted for the "Ask the Tester" were submitted after the magic number of 10 had been reached. However, they were forwarded to Markus and that presented me the opportunity to learn and be rinded of things I once knew and had forgotten (or channelled off into a safe place in my memory.)
My question to Markus was centered on his take of "Test Process Improvement" in an Agile environment. The bulk of his response was reasonably close to what I expected - in fact, reassuringly close to what I had prepared for the presentation so my confidence level increased dramatically in what I was saying. (Yes, a little reassurance is sometimes a good thing, particularly when one is a very little fish hanging out with very big fish.)
He had one idea that I did not have. And it left me gob-smacked. Tacked onto an already interesting sentence about the organization's management, Markus said "... or they don't trust testing anymore."
On Trust...
I was immediately thrown back many years to when Developers were called Programmers and when I was working as a COBOL Programmer on a large IBM mainframe. I had a Manager who did not trust his staff. Not because they were inexperienced, but because he simply did not trust them. To this day, I do not know why that was the case. I can surmise why, but it has little to do with the point. Suffice to say, it was an un-happy work environment.
Markus made an interesting observation. His point was that in Agile, the very purpose is to engender trust amongst all participants. Additionally, when management is invited to observe the meetings, they can gain an understanding of what is being done by their staff and as their understanding increases, so to should their level of trust.
When a group or a team has lost the trust of its management, the task of regaining that trust is nigh-on insurmountable. Likewise, if a manager or lead has lost the trust of the group they are to lead or manage, the results will almost certainly be dire.
On Process...
Thus, when the call comes down for "better metrics" or "process improvement" or any other number of topics. What is the underlying message? What is it that someone is hoping to gain? Do they know? CAN they know? Are they guessing?
Much is debated around QUANTifiable and QUALifiable considerations, measurement and understanding. I am not nearly bright enough to join into that fray fully-fledged.
What I have seen, however, is when Managers, Directors, VPs, EVPs, and big-bosses of all varieties are looking for something - nearly anything will suffice. A depressing number of times, I have seen management groups flail around what is wanted - then issue and edict announcing the new policy or practice or whatever it is. These tend to roll-out like clockwork, every three to six months.
Each company where I have worked that followed that practice engendered a huge amount of cynicism, resentment and distrust. The sad thing is that these rather stodgy companies - including some that were quite small and prided themselves on having no Dilbert-esque Pointy-Haired-Boss behaviors - were wasting an amazing opportunity.
The first step to fixing a "problem" is figuring out what the problem is. If there is no understanding over why policies or procedures are changing and no feed-back loop on the purposes behind the changed, will the average rank-and-file worker stand up and say "What do you hope to change/improve/learn from this?" At some companies - maybe. But I have seen relatively few times where the combination of policy-dujour and staff willing to stick their necks out and ask questions both exist in the same organization.
On Leadership...
What I have learned, instead, is to look at all sources of information. Explain what the problem or perceived problem is. Ask for input - then consider it fairly. To do so is not a sign of weakness - it is a sign of strength. That the leadership of the organization have enough trust in their workers to approach them with a problem and work together toward a solution.
This, in my mind, is the essence of building a team.
If you throw a bunch of people together without a unifying factor and expect great things it is silly in the extreme. In the military, "Basic Training" serves this purpose - laying the groundwork to trust your comrades and follow the direction of officers and non-commissioned officers. In the end though, the object is teamwork: learning to work together using each persons strengths to off-set others weaknesses.
Why is it that so many managers miss this rather elementary point? For a team to "work" they must learn to work together. If the Lead or Manager has not built the group into one capable of working together, like a team, what, other than professional pride, will get any results at all?
Although I can not prove this, in a scientific method as it were, I suspect that it is the essence of the problem mentioned above. The question I do not know the answer to, although suspect it, is the question of leadership in this instance.
Is it that they, the leaders, have no idea how to build a team? Is it possible that the step of instructing the fledgling team and shaping it into the needed form was too challenging? Could it be that in the process of doing so, their own closely held beliefs, habits and foibles were more dear than the building of a successful team?
If this basic lack is present, does it contribute to the selection of what is easy over what is right?
These are the ideas that have been floating through my mind while preparing the presentation and workshop lessons for the session at TesTrek. If the master knows that he is but a beginner in the craft, what of those who consider themselves experts in all aspects of our trade.
Can this be at the root of the behaviours I've seen first hand and read about? Are they feeling so insecure in their own abilities that they mistrust their own staff, the team they are charged with leading? Is it to make up for this lack, they flounder and grasp for tips or magic revelations that will show them the "path?" Is that why there is a continuing and perpetual drive for Metrics and Process Improvement?
It never seems to matter whether the lesson is an individual or group lesson, focused on one style or general drumming - the process of teaching beginners forces the instructor to reconsider things that the instructor simply does. This forces the teacher to reconsider all that he does, find interesting foibles or potential weaknesses, then correct or change them as needed for working with the student.
The interesting thing is that this reflection sometimes leads to profound understanding of what the student is learning and what the instructor is conveying. When preparing for the odd lunch-and-learn or training session at the office I never really had that kind of an experience - or when presenting such sessions.
On Improvement...
This last couple of weeks something interesting happened. I've been preparing a presentation on Test Process Improvement for TesTrek in October. I wasn't scheduled to present, or lead a workshop, but as a couple of presenters had to cancel, Viola! I'm on the presenters list. Then, a couple of other things came into my observation.
There have been several conversations on email lists I'm a participant in, as well as forums, on the dreaded M word. Yes - Metrics.
On top of this, I had a remarkably revealing email conversation with Markus Gartner - amazingly bright guy. This came about because the questions I submitted for the "Ask the Tester" were submitted after the magic number of 10 had been reached. However, they were forwarded to Markus and that presented me the opportunity to learn and be rinded of things I once knew and had forgotten (or channelled off into a safe place in my memory.)
My question to Markus was centered on his take of "Test Process Improvement" in an Agile environment. The bulk of his response was reasonably close to what I expected - in fact, reassuringly close to what I had prepared for the presentation so my confidence level increased dramatically in what I was saying. (Yes, a little reassurance is sometimes a good thing, particularly when one is a very little fish hanging out with very big fish.)
He had one idea that I did not have. And it left me gob-smacked. Tacked onto an already interesting sentence about the organization's management, Markus said "... or they don't trust testing anymore."
On Trust...
I was immediately thrown back many years to when Developers were called Programmers and when I was working as a COBOL Programmer on a large IBM mainframe. I had a Manager who did not trust his staff. Not because they were inexperienced, but because he simply did not trust them. To this day, I do not know why that was the case. I can surmise why, but it has little to do with the point. Suffice to say, it was an un-happy work environment.
Markus made an interesting observation. His point was that in Agile, the very purpose is to engender trust amongst all participants. Additionally, when management is invited to observe the meetings, they can gain an understanding of what is being done by their staff and as their understanding increases, so to should their level of trust.
When a group or a team has lost the trust of its management, the task of regaining that trust is nigh-on insurmountable. Likewise, if a manager or lead has lost the trust of the group they are to lead or manage, the results will almost certainly be dire.
On Process...
Thus, when the call comes down for "better metrics" or "process improvement" or any other number of topics. What is the underlying message? What is it that someone is hoping to gain? Do they know? CAN they know? Are they guessing?
Much is debated around QUANTifiable and QUALifiable considerations, measurement and understanding. I am not nearly bright enough to join into that fray fully-fledged.
What I have seen, however, is when Managers, Directors, VPs, EVPs, and big-bosses of all varieties are looking for something - nearly anything will suffice. A depressing number of times, I have seen management groups flail around what is wanted - then issue and edict announcing the new policy or practice or whatever it is. These tend to roll-out like clockwork, every three to six months.
Each company where I have worked that followed that practice engendered a huge amount of cynicism, resentment and distrust. The sad thing is that these rather stodgy companies - including some that were quite small and prided themselves on having no Dilbert-esque Pointy-Haired-Boss behaviors - were wasting an amazing opportunity.
The first step to fixing a "problem" is figuring out what the problem is. If there is no understanding over why policies or procedures are changing and no feed-back loop on the purposes behind the changed, will the average rank-and-file worker stand up and say "What do you hope to change/improve/learn from this?" At some companies - maybe. But I have seen relatively few times where the combination of policy-dujour and staff willing to stick their necks out and ask questions both exist in the same organization.
On Leadership...
What I have learned, instead, is to look at all sources of information. Explain what the problem or perceived problem is. Ask for input - then consider it fairly. To do so is not a sign of weakness - it is a sign of strength. That the leadership of the organization have enough trust in their workers to approach them with a problem and work together toward a solution.
This, in my mind, is the essence of building a team.
If you throw a bunch of people together without a unifying factor and expect great things it is silly in the extreme. In the military, "Basic Training" serves this purpose - laying the groundwork to trust your comrades and follow the direction of officers and non-commissioned officers. In the end though, the object is teamwork: learning to work together using each persons strengths to off-set others weaknesses.
Why is it that so many managers miss this rather elementary point? For a team to "work" they must learn to work together. If the Lead or Manager has not built the group into one capable of working together, like a team, what, other than professional pride, will get any results at all?
Although I can not prove this, in a scientific method as it were, I suspect that it is the essence of the problem mentioned above. The question I do not know the answer to, although suspect it, is the question of leadership in this instance.
Is it that they, the leaders, have no idea how to build a team? Is it possible that the step of instructing the fledgling team and shaping it into the needed form was too challenging? Could it be that in the process of doing so, their own closely held beliefs, habits and foibles were more dear than the building of a successful team?
If this basic lack is present, does it contribute to the selection of what is easy over what is right?
These are the ideas that have been floating through my mind while preparing the presentation and workshop lessons for the session at TesTrek. If the master knows that he is but a beginner in the craft, what of those who consider themselves experts in all aspects of our trade.
Can this be at the root of the behaviours I've seen first hand and read about? Are they feeling so insecure in their own abilities that they mistrust their own staff, the team they are charged with leading? Is it to make up for this lack, they flounder and grasp for tips or magic revelations that will show them the "path?" Is that why there is a continuing and perpetual drive for Metrics and Process Improvement?
Subscribe to:
Posts (Atom)